Please wait...
Applicability:
Landfill Caps may be temporary or final. Temporary caps can be installed before final closure to minimize generation of leachate until a better remedy is selected. They are usually used to minimize infiltration when the underlying waste mass is undergoing settling. A more stable base will thus be provided for the final cover, reducing the cost of the post-closure maintenance. Landfill caps also may be applied to waste masses that are so large that other treatment is impractical. At mining sites for example, caps can be used to minimize the infiltration of water to contaminated tailings piles and to provide a suitable base for the establishment of vegetation. In conjunction with water diversion and detention structures, landfill caps may be designed to route surface water away from the waste area while minimizing erosion.
Limitations:
Landfilling does not lessen toxicity, mobility, or volume of hazardous wastes, but does mitigate migration. Landfill caps are most effective where most of the underlying waste is above the water table. A cap, by itself, cannot prevent the horizontal flow of ground water through the waste, only the vertical entry of water into the waste. In many cases landfill caps are used in conjunction with vertical walls to minimize horizontal flow and migration. The effective life of landfill components (including cap) can be extended by long-term inspection and maintenance. Vegetation, which has a tendency for deep root penetration, must be eliminated from the cap area. In addition, precautions must be taken to assume that the integrity of the cap is not compromised by land use activities.